All systems go, and all hands on deck!
Work has started at the bakery, and so far this is what's happened...
1. The AC unit has been moved to the outside shed, and retrofitted. We are still waiting on the inside duct to come in so they can finish.
|
The AC unit is gone! |
2. The kitchen (near the bathroom area) has been framed in.
3. All the remaining plaster has been taken down. Phew!
4. A few floor boards were repaired due to rot.
|
Cutting out the rotten wood and replacing. |
5. The two brick walls have been sprayed with bleach, cleaned and painted with a water repelling solution.
6. Framing has started finished on the two brick walls.
7. The electrician came by to check things out. He should start Thursday.
Everyone pitched in, and helped move things along quickly. Heartfelt thanks goes out to Dr. Khan, Qumar Aunty, Arif, Sadia, Saad, Nasar, Omar Jr. and last but in no way least, Nadia. We love you all very much.
|